Springbank Hill has grown quickly on the corner of 17th Ave and 85th Street. Wilco took on multiple projects here in 2024. The new pathway alignment wandering alongside the valley bottom and the stand of native trembling aspens required tiers of retaining walls to accommodate. Wilco built long stretches of block walls here, curving along the pathway. The new central lawn area will be encircled by multifamily developments shortly, and will be a popular outdoor space for many. Wilco completed that big park in a very aggressive timeframe (less than a month on the calendar) to meet a challenging deadline – that included site grading, topsoiling, concrete and asphalt, planting, and sodding. This job was completed using a temporary irrigation system to keep the turf green and rooting in during a heat wave. Our level of professionalism combined with the level of commitment and effort by our project team and crews ensured we would meet whatever challenge came at us.