Elk Point
Client: City of Saskatoon
Date: 2015
25 acre storm pond constructed in the future Elk point subdivision:
Work included:
- Clearing and grubbing of existing vegetation
- 20 acres of existing pond and wetland dewatering
- 25 acres of topsoil stripping
- 410,000m3 of earth movement for storm water retention pond construction
- 400m storm culverts (installed under pressurized sanitary force main )
- 8m deep storm control structure manhole