25 acre storm pond constructed in the future Elk point subdivision:

Work included:

  • Clearing and grubbing of existing vegetation
  • 20 acres of existing pond and wetland dewatering
  • 25 acres of topsoil stripping
  • 410,000m3 of earth movement for storm water retention pond construction
  • 400m storm culverts (installed under pressurized sanitary force main
  • )
  • 8m deep storm control structure manhole