West Bowmont Storm Pond
Client: Lorem ipsum
Date: 07/07/2012
The scope of work on this project included excavating and shaping a 100,000 m3 storm pond in Bowmont Park; including control structures and a storm sewer system, clay and geosynthetic liner, asphalt pathways and landscaping, and an outfall to the Bow River.